Project Delivered by Homcrafts cannot be endorsed to any other brand , associated brand or Company if done the warranty and serviced will be considered Void and Null
PRICE PROMISE
Homcrafts guarantees the prices in this proposal for a period of two weeks. Prices may vary when booked beyond this date. Quoted prices are applicable for this proposal only, any modifications may result in a change of prices.
The above quote is an estimate based on current design and sizes. They are liable to change till the sign off/ production stage depending on the actual measurements at site and/or design and finishes selected, increase in scope of work, and/or changes made by you or as per your instructions.
Payment Terms
First Payment before Starting the Design Prototype: 10%
Second Payment of before Material Selection: 30%
Third Payment after Project Sign-Off and Before Production: 40% Fourth Payment post production and before dispatch: 20%
Cancellation Policy
Any advance paid on the confirmation of the project or any step in the process is nonrefundable.
Project cancellation can be considered valid only when an email is written to info@homcrafts.comsiting the reason for cancellation is provided.
TAXES & DUTIES
All Homcrafts product pricing is exclusive of taxes. The taxes have been mentioned in your estimate separately and will be charged at the time of billing at each stage as per prevailing government tax rates.
COPYRIGHTS
Designs shared with the client at any stage are the exclusive copyright of Homcrafts. The designs are shared with the intent that the order for the same is placed and executed by Homcrafts. Any designs shared by Homcrafts cannot be used, installed and/ or shared in any way or form without prior and written consent of Homcrafts.
TIMELINES
When we committed to completing your project in 45 days/ 60 days/ 90 days 2 BHK, 3 BHK, 4BHK respectively, it is the time period for executing the project after Design Sign-off. The starting and ending dates will be defined in the email post Production sign off.
Thestarting date is the date from when 40% of the payment is collected and as per the estimate is realized by the accounts team and 2D designs are approved.
Incase of delays due to Homcrafts errors, Homcrafts will pay Rs 15,000 per month on a pro-rata basis for all the days of delay beyond the handover date after a grace of 2 weeks.
Thepenalty will not be more than 3% of the interior project
Noother compensation will be provided for besides the delay compensation that is stated
Delay compensation will not be applicable if the Customer/Acquaintances staying in property while work getting done Customer vendor workingat the site at any point while Homcrafts contractors are present Restrictions in working at site – timings, manpower restrictions Design changes after design closure – modification of scope of work Power, Water supply issues at site Delays caused due to customer approvals pending Unforeseen issues not attributable to Homcrafts on raw material, manpower
DESIGN PHASES AND RULES
Designing is distributed intothree In Phase 1 customer can have 2-3 design Iterations at the maximum and can add or remove items from the estimate. Removal of items is approved only in phase 1 and of about only 20% of the scope can be reduced when the estimate was booked.
In phase2 only additions can be made and no subtraction from the scope is allowed with respect to Phase 2 can have 2 Iterations at the maximum.
Phase3 is validation phase, No Items can be added or removed in this stage and only electrical/plumbing scope can be
Nofurther discounts can be added after the project is booked. No oral communications will be considered valid if promised during the
After5 Iterations of designing, every sitting will be charged 7 thousand and will be added in the estimate and it will be non-discountable
Sitevalidation is approved for only 1 time and no site validation will be provided more than 1 Second time validation would cost Rs 30,000
Estimationcan be changed only for 4 times and sitting charges will be added for the changes added more than 4 Charges are Rs.2 thousand per sitting.
For any technical related queries post the booking as technical analyst will be provided on prior appointment basis for 20 minutes and customercan have their answers for their queries but pricing information will not be entertained with the Rs.2 thousand will be charged for session for subsequent technical discussion and to be paid up front.
Work timings for the designer is between 11:30 AM to 7:30 PM. Turnaround time (TAT) for the designer to answer your queries is 24 Hours.
Design discussion duration/period can be of maximum 3 to 4 hours at a stretch and unless or otherwise designer is comfortable to extend or formal approval is shared on the social handles. Post the stretch subsequent meeting time/date will be shared by the designer based on the availability
Materialselection post the design freeze is allowed for 6 hours only and the material selection can be done only in two sessions
Mondaysare week off for the design team and response can be expected next working day
Customer visitingto office appointment basis and direct designer meeting without prior appointment is not allowed required for the dedicated time required for the customer so that we can serve better.
Onlinemeeting on request has to be approved 6 hours prior for the dedicated time required for the customer so that we can serve
DESIGN CHANGES DUE TO TECHNICAL NON-FEASIBILITY
At the time of execution, there may be design changes due to site condition, material changes and/ or technical non-feasibility. The client should approve these changes when brought to their attention by the project manager and the implication(s) thereof.
MATERIAL CHANGE
Clients canmake changes to the materials selected up-to design sign-off stage. Any material changes made post the payment of 60% will incur the cost of the works undertaken and might result in an increase in timelines.
Materialscan be changed with Clients approval because of:
Materialunavailability (after earlier confirmation received)
Ifthe quality of what was selected by the client changed during procurement
Homcraftsis not happy with the quality provided by the vendor
Finishand material selections must be done from the Homcrafts approved catalogue
VALUE ADDED SERVICES
Company offers 6 Months of Free service which includes 2 Visits for any Error in Fittings or Loose Fitting happened due to on Premise execution by the In house team. The company also has a observation period of 3 Months in that customers can inform the company about the Loose This Point is not valid for any fittings Error / Issue caused due to rough usage or any physical Damage / Friction occurred.
Deep cleaning of your project willbe undertaken by Homcrafts one time, before handover on a chargeable basis. Post site inspection, the cost for the same will be shared.
Regularcleaning service will be provided at an extra cost based on the scope of cleaning work to be This will be applicable every occasion we take up the activity viz post false ceiling work cleaning, post wood work installation etc.
Floor-coveringof your project will be undertaken by Homcrafts, before the commencement of works at site, on a chargeable
Debris disposalwill be undertaken by Homcrafts on a chargeable basis and estimates will be shared every time the activity is to be
Electricals labor jobs can be undertaken by our in-house electrical team. Post completion of design and inspection of the site, a detailed estimate shall be shared. The clients are free to engage their own electrical or engage Homcrafts for these
Gas Piping & other civil job services are provided by outsourced vendors who shall inspect the site based requirements and provide the estimates.
Homcraftscan provide supervisory services for supervising non-Homcrafts vendor’s works on request by the client, especially with regards to works that need to be done in concurrence with Homcrafts The Homcrafts team are not responsible for, nor can give warranties for the quality or timelines of the works undertaken by the vendor(s)
Clients canmake changes to the materials selected up-to design sign-off stage. Any material changes made post the payment of 60% will incur the cost of the works undertaken and might result in an increase in timelines.
Materialscan be changed with Clients approval because of:
Materialunavailability (after earlier confirmation received)
Ifthe quality of what was selected by the client changed during procurement
Homcraftsis not happy with the quality provided by the vendor
Finishand material selections must be done from the Homcrafts approved catalogue
After5 Iterations of designing, every sitting will be charged 7 thousand and will be added in the estimate and it will be non-discountable
Sitevalidation is approved for only 1 time and no site validation will be provided more than 1 Second time validation would cost Rs 30,000
Estimationcan be changed only for 4 times and sitting charges will be added for the changes added more than 4 Charges are Rs.2 thousand per sitting.
For any technical related queries post the booking as technical analyst will be provided on prior appointment basis for 20 minutes and customercan have their answers for their queries but pricing information will not be entertained with the Rs.2 thousand will be charged for session for subsequent technical discussion and to be paid up front.
Work timings for the designer is between 11:30 AM to 7:30 PM. Turnaround time (TAT) for the designer to answer your queries is 24 Hours.
Design discussion duration/period can be of maximum 3 to 4 hours at a stretch and unless or otherwise designer is comfortable to extend or formal approval is shared on the social handles. Post the stretch subsequent meeting time/date will be shared by the designer based on the availability
Materialselection post the design freeze is allowed for 6 hours only and the material selection can be done only in two sessions
Mondaysare week off for the design team and response can be expected next working day
Customer visitingto office appointment basis and direct designer meeting without prior appointment is not allowed required for the dedicated time required for the customer so that we can serve better.
Onlinemeeting on request has to be approved 6 hours prior for the dedicated time required for the customer so that we can serve
DESIGN CHANGES DUE TO TECHNICAL NON-FEASIBILITY
At the time of execution, there may be design changes due to site condition, material changes and/ or technical non-feasibility. The client should approve these changes when brought to their attention by the project manager and the implication(s) thereof.
MATERIAL CHANGE
VALUE ADDED SERVICES
Company offers 6 Months of Free service which includes 2 Visits for any Error in Fittings or Loose Fitting happened due to on Premise execution by the In house team. The company also has a observation period of 3 Months in that customers can inform the company about the Loose This Point is not valid for any fittings Error / Issue caused due to rough usage or any physical Damage / Friction occurred.
Deep cleaning of your project willbe undertaken by Homcrafts one time, before handover on a chargeable basis. Post site inspection, the cost for the same will be shared.
Regularcleaning service will be provided at an extra cost based on the scope of cleaning work to be This will be applicable every occasion we take up the activity viz post false ceiling work cleaning, post wood work installation etc.
Floor-coveringof your project will be undertaken by Homcrafts, before the commencement of works at site, on a chargeable
Debris disposalwill be undertaken by Homcrafts on a chargeable basis and estimates will be shared every time the activity is to be
Electricals labor jobs can be undertaken by our in-house electrical team. Post completion of design and inspection of the site, a detailed estimate shall be shared. The clients are free to engage their own electrical or engage Homcrafts for these
Gas Piping & other civil job services are provided by outsourced vendors who shall inspect the site based requirements and provide the estimates.
Homcraftscan provide supervisory services for supervising non-Homcrafts vendor’s works on request by the client, especially with regards to works that need to be done in concurrence with Homcrafts The Homcrafts team are not responsible for, nor can give warranties for the quality or timelines of the works undertaken by the vendor
The Woodwork warranty shall be null and void, and Homcrafts shall not be liable if the damage is due to:
Products, Services & Materials |
Period |
Warrant y |
Exceptions |
Woodwork – Plywood- BWP Plywood, Commercial plywood |
10 years |
This Warranty is a structural warranty that covers delamination, edge-band peeling, and bubbles in lamination and borer- infection. It also covers any Bend more than 8mm, caused due to weather conditions and moisture level in the atmosphere. Plywood used is borer-proof and termite- resistant |
Damage to woodwork due to continuous seepage of water/ dampness because of seepage of water from ceiling, flooring, walls and/or other site conditions is not covered under warranty. Damage due to misuse and negligence by the client and normal wear and tear will not be covered. Further, notwithstanding anything contained under woodwork warranty, there shall be no warranty for surface damage and/or damage due to scratches in relation to acrylic, high-gloss laminate, duco and PU, and/or veneer. |
Woodwork – HDHMR |
10 years |
This Warranty is a structural warranty that covers delamination, edge-band peeling, bubbles in lamination and borer- infection. It also covers any bend more than 8mm, caused due to weather conditions and moisture level in the atmosphere. |
Damage to woodwork due to continuous seepage of water/ dampness because of seepage of water from ceiling, flooring, walls and/or other site conditions is not covered under warranty. Damage due to misuse and negligence by the client and normal wear and tear will not be covered. Further, notwithstanding anything contained under Woodwork Warranty, there shall be no warranty for surface damage and/or damage due to scratches in relation to acrylic, high-gloss laminate, duco and PU, and/or veneer. |
Please note that Homcrafts will first attempt to repair the defective or damaged woodwork under the woodwork warranty. Only in the event that the Homcrafts (at its sole discretion) decides that the repair is not feasible then it shall replace the defective or damaged woodwork under the woodwork warranty. The client agrees that the decision of the Homcrafts (as provided therein) shall be final and binding.
Further, please note that if the client is required to purchase and install a more valuable material under the woodwork warranty, then the client cannot claim/recover the additional value of the better material.
Homcrafts in the course of undertaking the project works, will/has provided certain materials, equipment, appliances and goods manufactured, fabricated, assembled and/or sold by third party vendors, distributors, and manufacturers (“Third Party Products”). In relation thereto, Homcrafts hereby assigns (to the extent they are assignable) and conveys to the Client all manufacturers and supplier warranties together with operating instructions, if available (“Third Party Products”). The Third Party Products, which are subject to the Third Party Warranties cover:
Products & Services & Materials |
Period |
Warranty |
Exceptions/Exclusions |
Countertops – All Counter tops natural and artificial, specifically granite and engineered stone such as quartz stone, engineered marble etc. |
1 year |
warranty covers any cracks, staining and leakage during and immediately after installation works by Homcrafts |
The warranty does not cover fading of color and cracks in the stone due to manufacturing defects. The warranty does not cover marble, other natural stones such as onyx, sandstone, limestone, slate, etc. and artificial stones such as solid surface stones (also known as Corian), etc. |
Hardware: Manufacturer’s warranty on products |
Period as defined by the Manufacturer – Up to 7 Years |
Warranty as per terms given by the specific brands |
Exceptions are as per the terms Given by the brands. |
False Ceiling & False Ceiling installation: Manufacturer’s warranty on products |
1 years |
Warranty covers any damage within the 1 year of installation, will be repaired by Homcrafts |
This does not cover any damage caused by client or its agents/representatives |
Electrical Appliances, Mirrors, Glasses, Gas Piping, Tiling & Civil works, Electrical Switches, Wires and LED Lights, Misc. Items: Manufacturer’s Warranty |
Period as defined by the Manufacturer |
Warranty terms as defined by the manufacturer |
Exclusions as defined by the manufacturer. |
Sinks, Taps and any Plumbing Installation: Manufacturer’s Warranty on the Products |
Period as defined by the Manufacturer- Up to 10 yrs. |
No warranty for installation of taps and drain pipes for leakage after Handover. |
Any leakage during and immediately after installation works by Homcrafts, will be corrected by Homcrafts. |
It is hereby clarified that in the event there is any conflict between the terms and conditions contained herein, and the third party warranties, the third party warranties shall prevail. Provided however, Homcrafts is not providing any warranty (express and/ or implied) in relation to the third party products, and shall not be liable in relation thereof. Therefore, the client’s sole remedy in relation to the third party products lies with the third party vendors and manufacturers. Please note that for every new product and/or service offered by the Homcrafts, the third party warranties extended by the supplier of the new product and/or Homcrafts of the services.
Product finish for which, we won’t be held responsible.
Please call our customer support @ service@homcrafts.com for any service related requests.